首页> 外文期刊>Waste management & research >Temperature monitoring during a water-injection test using a vertical well in a newly filled MSW layer of a landfill
【24h】

Temperature monitoring during a water-injection test using a vertical well in a newly filled MSW layer of a landfill

机译:在新填埋的垃圾填埋场中,使用垂直井注水测试期间的温度监控

获取原文
获取原文并翻译 | 示例
       

摘要

High temperature may adversely affect municipal solid waste (MSW) biodegradation and lead to an increase in the deformation of high-density polyethylene (HDPE) pipes used for the collection of leachate and landfill gas in landfills. The test in this study was to change the waste temperature around the vertical injection well by water injection using a vertical well. The test was conducted intermittently with two different flowrates in a newly filled MSW layer of a landfill. The temperature, gas pressure and leachate level in the test area were simultaneously monitored during this study. The results showed that the waste temperature around the vertical injection well was effectively changed by water injection, which did not result in a significant rise in the leachate level. During water injection, the waste temperature influence distance in the horizontal direction increased with depth from the leachate level to the bottom of the injection well. The bottom temperature of the injection well decreased to near the water-injection temperature. The range of influence of the waste temperature caused by intermittent water injections slightly increased in this test. After water injection was stopped, the waste temperature near the vertical injection well increased quickly initially, and then the increments became more gradual with time. When the leachate level recovered stably, there was still a temperature gradient around the injection well within the range of influence. The temperature and gas pressure in the waste above the leachate level and far away from the injection well were slightly influenced by water injection.
机译:高温可能会对市政固体废物(MSW)的生物降解产生不利影响,并导致用于收集垃圾填埋场渗滤液和垃圾填埋气的高密度聚乙烯(HDPE)管的变形增加。本研究中的测试是通过使用垂直井注水来改变垂直注入井周围的废料温度。该测试是在两个新流速的垃圾填埋场中新填充的MSW层中间歇进行的。在这项研究期间,同时监测了测试区域的温度,气压和渗滤液水平。结果表明,通过注水有效地改变了垂直注入井周围的废物温度,但并未导致渗滤液水平的显着提高。在注水过程中,废物温度在水平方向的影响距离随着渗滤液水平到注入井底部的深度而增加。注入井的底部温度降低到接近注入水的温度。在此测试中,间歇注水对废水温度的影响范围略有增加。停止注水后,立式注水井附近的废料温度开始迅速升高,然后随着时间的推移逐渐升高。当渗滤液水平稳定恢复时,在影响范围内,注入井周围仍存在温度梯度。注入水对渗滤液中高于沥滤液水平且远离注入井的废物的温度和气压有轻微的影响。

著录项

  • 来源
    《Waste management & research》 |2019年第5期|530-541|共12页
  • 作者单位

    Hohai Univ, Geotech Engn Res Inst, 1 Xikang Rd, Nanjing 210098, Jiangsu, Peoples R China|Hohai Univ, Minist Educ Geomech & Embankment Engn, Key Lab, Nanjing, Jiangsu, Peoples R China|Hohai Univ, Jiangsu Res Ctr Geotech Engn Technol, Nanjing, Jiangsu, Peoples R China;

    Hohai Univ, Geotech Engn Res Inst, 1 Xikang Rd, Nanjing 210098, Jiangsu, Peoples R China|Hohai Univ, Minist Educ Geomech & Embankment Engn, Key Lab, Nanjing, Jiangsu, Peoples R China|Hohai Univ, Jiangsu Res Ctr Geotech Engn Technol, Nanjing, Jiangsu, Peoples R China;

    Michigan Dept Environm Qual, Lansing, MI USA;

    Hohai Univ, Geotech Engn Res Inst, 1 Xikang Rd, Nanjing 210098, Jiangsu, Peoples R China|Hohai Univ, Minist Educ Geomech & Embankment Engn, Key Lab, Nanjing, Jiangsu, Peoples R China|Hohai Univ, Jiangsu Res Ctr Geotech Engn Technol, Nanjing, Jiangsu, Peoples R China;

  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

    Temperature; gas pressure; leachate level; vertical well; water-injection test; newly filled MSW layer;

    机译:温度;气压;渗滤液液位;垂直井;注水试验;新填充的城市固体废弃物层;
  • 入库时间 2022-08-18 04:15:52

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号