...
首页> 外文期刊>Ux Weekly >CGN begins pouring first safety-related concrete at Taipingling 2
【24h】

CGN begins pouring first safety-related concrete at Taipingling 2

机译:CGN在Taipingling 2开始浇注第一个安全相关的混凝土

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

UxC has learned that China General Nuclear (CGN) began pouring the first safety-related concrete at Unit 2 of the Taipingling nuclear power plant in Guangdong Province, China, on October 15. The occasion marks the official start of construction for the HPR-1000 (Hualong One) reactor and follows a report from China’s National Nuclear Safety Administration (UxW34-42) that approved CGN’s plans to begin pouring foundational and safety-related concrete at the site. The Taipingling nuclear power plant is envisioned to host a total of six reactors when completed. CGN began pouring concrete at Unit 1 of the Taipingling nuclear power plant in December 2019.
机译:乌克斯概述了中国核(CGN)于10月15日开始在中国广东省太平岭核电站第2款安全相关混凝土倾吐。这一场合标志着HPR-1000的官方开始(华龙一)反应堆并遵循中国国家核安全管理局(UXW34-42)的报告,该报告批准了CGN计划在该网站开始倾注基础和安全相关的混凝土。 Taipingling核电站设想完成后举办六个反应堆。 CGN于2019年12月在Taipingling核电站的第1单元开始浇筑混凝土。

著录项

  • 来源
    《Ux Weekly》 |2020年第45期|3-4|共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号