首页> 外文期刊>Utilities Policy >Kenya's lessons from two decades of experience with independent power producers
【24h】

Kenya's lessons from two decades of experience with independent power producers

机译:肯尼亚从独立发电商的二十年经验中学到的教训

获取原文
获取原文并翻译 | 示例
           

摘要

Adequate, secure, and competitively priced electricity is vital for powering economic growth and development. Privately funded, independent power producers (IPPs) are now making an important contribution to meeting overall power needs in developing countries, including in Africa. Our aim in this article is to explore what may be learned from Kenya's experience with IPPs and what lessons might be applied to other developing countries. We consider how Kenya's IPPs measure up to their public counterparts in terms of reliability and costs and possibilities for scale-up. Kenya's two decades of experience with power sector reform and IPPs makes it possible to compare changing policies, sector unbundling, regulatory frameworks, planning, and investment over a relatively long period. Kenya is also host to IPPs with different technology bases, which allow for an evaluation of their relative costs and reliability. Finally, the mix of directly negotiated and competitively bid projects facilitates a comparison of procurement practices. While power sector reform in Kenya created an enabling environment for IPPs, probably more important was the development of effective planning, tendering, and contracting capabilities, which attracted investment at competitive prices. The challenge for Kenya and other developing countries is to maintain and sustain these capabilities within clear policies that provide regular opportunities for the private sector to contribute to meeting power deficits.
机译:充足,安全和具有价格竞争力的电力对于推动经济增长和发展至关重要。私人资助的独立电力生产商(IPP)现在正在为满足包括非洲在内的发展中国家的整体电力需求做出重要贡献。我们在本文中的目的是探讨从肯尼亚的IPP经验中可以学到什么,以及哪些经验教训可以应用于其他发展中国家。我们考虑肯尼亚的IPP在可靠性,成本和扩大规模方面如何衡量其公共对手。肯尼亚在电力行业改革和IPPs方面的二十年经验使我们有可能在相对较长的时期内比较不断变化的政策,行业分拆,监管框架,规划和投资。肯尼亚还是拥有不同技术基础的国际植检门户网站的所在地,因此可以对其相对成本和可靠性进行评估。最后,直接谈判和竞争性招标项目的组合有助于比较采购做法。尽管肯尼亚的电力部门改革为IPP提供了有利的环境,但更重要的是发展有效的规划,招标和签约能力,以有竞争力的价格吸引了投资。肯尼亚和其他发展中国家面临的挑战是在明确的政策中维持和维持这些能力,这些政策为私营部门提供了定期机会,以解决电力短缺问题。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号