SUBSEA 7 has scooped what it calls a "very large" deal from Petrobras covering development of the Mero-3 pre-salt field in the Santos basin offshore Brazil. The contract covers engineering, fabrication, installation and pre-commissioning of subsea equipment. This includes 80 kilometres of rigid risers and flowlines for the steel lazy wave production system, 60 kilometres of flexible service lines and 50 kilometres of umbilicals and associated infrastructure.
展开▼