【24h】

Gorgon trouble for Chevron

机译:鹅狸龙的麻烦

获取原文
获取原文并翻译 | 示例
           

摘要

US supermajor Chevron is facing issues at its carbon capture and storage (CCS) project associated with the Gorgon liquefied natural gas development in Western Australia, resulting in additional carbon dioxide being vented into the atmosphere. Independent news outlet Boiling Cold this week published a document it obtained under freedom of information laws, which revealed the pressure management system at the world's largest CCS project was currently off line. In the annual report from Chevron, which was published on 30 September last year, the operator claimed the injection system was "operating reliably". However, it revealed delays had been experienced with the commissioning of the pressure management system.
机译:美国Supermajor Chevron正在与西澳大利亚州西澳大利亚州Gergon液化天然气开发相关的碳捕集和储存(CCS)项目面临的问题,导致额外的二氧化碳排放到大气中。本周独立新闻出口沸腾感冒发表了一份文件,它在信息法律自由中获得,揭示了世界上最大的CCS项目的压力管理系统目前离线。在去年9月30日发布的雪佛龙的年度报告中,运营商声称注射系统是“可靠运行”。但是,随着压力管理系统的调试,它透露了延误。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号