首页> 外文期刊>Upstream: The International Oil & Gas Newspaper >Aibel nets floater work for Shell's Pierce field
【24h】

Aibel nets floater work for Shell's Pierce field

机译:aibel网上浮动壳的猛扑领域

获取原文
获取原文并翻译 | 示例
           

摘要

NORWEGIAN contractor Aibel has landed work to convert and extend the life of Bluewater's Haewene Brim floating production, storage and offloading vessel as Shell embarks on a blowdown project to exploit the gas cap at its Pierce field in the UK central North Sea. The FPSO is scheduled to come off station in April or May next year, vessel owner Bluewater confirmed to Upstream. Aibel's shipyard in Haugesund will modify the gas export system, replace the integrated control system and carry out the work to extend the vessel's life. The yard visit is planned to last about three months, the Dutch offshore contractor said.
机译:挪威承包商Aibel已降落工作,以皈依和延长Bluewater的Haewene Brim Floating生产,储存和卸载船只的浮动船只,因为壳牌踏上了一个排污工程,从英国中央北海的皮尔斯领域利用煤气帽。 FPSO计划于4月或明年5月下车,Bluewater在上游证实。 Aibel在Haugesund的造船厂将改变天然气出口系统,更换综合控制系统,并执行延长船只的生命的工作。荷兰海上承包商表示,院子访问计划持续大约三个月。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号