【24h】

Equus targets first gas date

机译:Equus目标第一天然气日期

获取原文
获取原文并翻译 | 示例
       

摘要

PRIVATELY owned Western Gas said that its Equus project off Australia remains on target for first gas in 2024, writes Iain Esau. Executive director Andrew Leibovitch said that the engineering and design process undertaken by the company's development partners McDer-mott and Baker Hughes has "delivered a globally competitive, mid-scale LNG development plan for the Equus fields." The development comprises , three subsea production wells tied back to a floating production storage and offloading vessel, plus a 160-kilometre gas export pipeline to a nearshore floating liquefied natural gas vessel with a capacity of 2 million tonnes per annum. Gas from the FLNG complex would also be linked to shore via another pipeline.
机译:私营的西方天然气表示,它的澳大利亚的Equus项目仍然是2024年的第一个天然气的目标,写道Iain Esau写道。执行董事Andrew Leibovitch表示,该公司开发合作伙伴MCDER-MOTT和BAKER HUGHES开展的工程和设计过程已经“为平均田地提供了全球竞争,中型液化局域网发展计划。”该开发包括,三个海底生产井绑在浮动生产储存和卸载船上,加上一个160公里的天然气出口管道,到近岸浮动液化天然气船,每年容量为200万吨。来自FLNG复合物的气体也将通过另一个管道与岸上连接。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号