【24h】

Novatek loads up LNG plan

机译:Novatek加载LNG计划

获取原文
获取原文并翻译 | 示例
       

摘要

NOVATEK has finalised a plan to use a single gas liquefaction and loading outlet for its next two Russian domestic liquefied natural gas projects on the Gydan Peninsula in West Siberia, Arctic LNG 2 and Arctic LNG 1 — a decision that is set to lead to a delay in commissioning at the terminal. The Russian independent has committed to investing an additional 20 billion roubles ($310 million) in the construction of the Utrenny marine terminal on the western shore of the Gydan Peninsula, according to a draft governmental resolution published on its website.
机译:NOVATEK已完成一项计划,计划在西西伯利亚的吉丹半岛上的下两个俄罗斯国内液化天然气项目使用单一的液化和装料出口,该项目将导致北极液化天然气2和北极液化天然气1 –这项决定将导致延迟在码头调试。根据其网站上发布的政府决议草案,俄罗斯独立组织已承诺再投资200亿卢布(3.1亿美元),用于在吉丹半岛西岸修建乌特鲁尼海洋码头。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号