...
首页> 外文期刊>Upstream: The International Oil & Gas Newspaper >Equinor delays deadline for Carcara rig bids
【24h】

Equinor delays deadline for Carcara rig bids

机译:Equinor推迟了Carcara钻机投标的截止日期

获取原文
获取原文并翻译 | 示例
           

摘要

NORWAY'S Equinor has pushed back by a few weeks the date to welcome bids in a tender to charter a high-specification rig to carry out development drilling at the Carcara pre-salt field off Brazil, writes Fabio Palmigiani. Sources told Upstream that Equinor pushed back the deadline to 9 December from the original 20 November date. Drillers including Transocean, Valaris and Sead-rill are understood to have been invited to participate in the tender.
机译:Fabio Palmigiani写道,NORWAY的Equinor推迟了几个星期的日期,以招标方式租用一个高规格的钻机,以在巴西附近的Carcara盐下油田进行开发钻探。消息人士告诉上游,Equinor将截止日期从原来的11月20日推迟到12月9日。据了解,包括Transocean,Valaris和Sead-rill在内的钻工都应邀参加了招标。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号