Water ingress through cracks in the existing concrete lining of the 30-year old Chekka highway tunnel, north of Beirut, forced Lebanon's Council of Development and Reconstruction to refurbish the parallel 360m and 390m long three-lane tubes. Design was based on installing a PVC waterproofing membrane and casting a new 250mm thick reinforced in-situ concrete lining.rnIn spring 2006 contractor Est Antoine Makhlouf, of Beirut, tendered according to the project design and was awarded the contract.