Shaft, station changes for Copenhagen

机译:哥本哈根的轴,车站变化

获取原文
获取原文并翻译 | 示例
           

摘要

Design development for next phase of Copenhagen metro has cut the number of shafts and resulted in shallower construction at some stations.rnThe client, Metroselskabet, said that it has been decided to drop 15 shafts - three-quarters of the initial total -from the 15km long, twin bore Cityringen project. It said that safety for the metro system would be improved by technology, such as installing sprinklers in trains, and that fewer shafts meant less disruption from construction traffic.rnThree of the project's 17 stations are to constructed at shallower levels than usual in the Danish capital's metro system, and the possibility of raising a fourth is being investigated. In earlier planning, most stations had platforms at approximately 18m-19m below the surface, and the deepest sites at 24m and 28.5m,rnrespectively.
机译:哥本哈根地铁下一阶段的设计开发减少了竖井的数量,并导致某些车站的建设变浅。客户Metroselskabet表示,已决定从15公里内掉落15竖井,占最初总数的四分之三。长的双孔Cityringen项目。它说,地铁技术的安全性将通过技术来提高,例如在火车上安装洒水装置,并且减少竖井就意味着对建筑交通的干扰更少。rn该项目的17个车站中有3个车站的建造水平将比丹麦首都平时低。地铁系统,以及提高四分之一的可能性正在研究中。在早期的计划中,大多数站点的平台分别位于地面以下约18m​​-19m,最深的站点分别位于24m和28.5m。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号