Drill and blast excavation is underway on six faces of the longest tunnel on the sprawling water conveyance system that will feed the Simplico hydro project in Brazil. The top bench of the 6,030km long bore is being opened to 7.5m high by 15m wide, the standard width of all four tunnels on the scheme. The lower bench height of the "T3" tunnel will be 7.2m to give a final height of 15.7m.Geology along all four tunnel alignments comprises gneiss with typical UCS of 200MPa. In recent months, as the excavation gets underway from the upstream and downstream portals and access tunnels a third of the way from each end, to give two faces each, the average advance has been 6m per day.
机译:蔓延的输水系统上最长的隧道的六个工作面正在进行钻探和爆破开挖,这将为巴西的Simplico水电项目提供服务。全长6,030 km的高台台阶被打开至7.5 m高x 15 m宽,这是该方案中所有四个隧道的标准宽度。 “ T3”隧道的下台阶高度为7.2m,最终高度为15.7m。沿着所有四个隧道路线的地质构造都包括片麻岩,典型UCS为200MPa。近几个月来,随着挖掘工作从上游和下游门户开始进行,并且从两端开始进出隧道,各给两个面,平均进给量为每天600万。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号