Crossrail confirmed the shortlist for two contracts on 2 September, one for the refurbishment of the Connaught Tunnel and one for constructing the Pudding Mill Lane Tunnel portal.rnShortlisted for contract 315 for the Connaught Tunnel are Vinci Construction UK; Hochtief Murphy joint venture; Bam Nuttall; and VolkerFitzpatrick Barhale jointrnventure. The approximately 550m long tunnel runs between Royal Victoria Dock and Royal Albert Dock, and will need to be enlarged to accommodate Crossrail trains. About 100m of tunnel wall will need to be replaced with a new lining and other parts will be retained and repaired.
展开▼