...
【24h】

Monitoring Stratford

机译:监控斯特拉特福德

获取原文
获取原文并翻译 | 示例
           

摘要

As part of the West Ham Flood Alleviation Scheme, Thames Water commissioned the construction of a tunnel that passed approximately 15-20m below the south end of the Stratford Market London Underground depot train stabling roads, Jubilee Line running lines into Stratford Station, the spur line into the depot and the Dockland Light Railway Abbey Road construction site. As a result of the construction of this flood alleviation tunnel some vertical surface ground movement was expected, which potentially could have had an adverse effect on the infrastructure above and the safe operation of the railway systems. Consequently a programme of precise survey monitoring was required to check for any movement.
机译:作为西汉姆河防洪减灾计划的一部分,泰晤士水务公司委托建造了一条隧道,该隧道通过斯特拉特福德市场伦敦地下仓库火车稳定道路南端下方约15-20m,朱比利线运行线进入支线斯特拉特福德站进入仓库和Dockland轻轨铁路修道院路施工现场。由于该防洪隧道的建设,预计会有一些垂直地面运动,这可能会对上方的基础设施和铁路系统的安全运行产生不利影响。因此,需要一个精确的调查监视程序来检查是否有任何运动。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号