首页> 外文期刊>Tunnels & tunnelling international >PRACTICAL TBM EXCAVATION DATA PROCESSING
【24h】

PRACTICAL TBM EXCAVATION DATA PROCESSING

机译:实用的TBM开挖数据处理

获取原文
获取原文并翻译 | 示例
           

摘要

Data Collected during shield tunnelling are frequently used for understanding the interaction between machine and the ground. Of paramount interest are those parameters which directly reflect the contact between machine and soil or which describe the excavation process itself. These parameters include: 1. Thrust force on the cutting wheel [KN] 2. Total thrust force [Kn] 3. Torque on the cutting wheel [MNm] 4. Penetration [mm/rev] as a calculated value from the parameters: 4.1 Cutting wheel speed [rev./min] 4.2 Advance speed [mm/min]
机译:盾构施工期间收集的数据通常用于了解机器与地面之间的相互作用。最重要的是那些直接反映机器与土壤之间的接触或描述开挖过程本身的参数。这些参数包括:1.切割轮上的推力[KN] 2.总推力[Kn] 3.切割轮上的扭矩[MNm] 4.渗透率[mm / rev],根据参数计算得出:4.1切割轮速度[rev./min] 4.2前进速度[mm / min]

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号