The backup train of the Waterview Connection TBM was in the process of being turned to join up with the cutterhead and shield already working on its second bore path as Tunnels and Tunnelling went to press. Construction work paused on 20 February after the TBM, with support from a temporary gantry setup, had excavated the required 270m of the second tunnel. New Zealand Transport Agency highway manager Brett Gliddon said: "There is now enough room bring all the necessary gear into the tunnel so that we can complete the job." The temporary gantry has to be removed. And the two remaining gantries - which contain all services and backup equipment for TBM operation - have to be pulled from the first tunnel, turned 180 degrees inside the Northern Approach Trench (NAT), and then reconnected to the cutter head. The culvert-laying gantry being used to build the services culvert on the floor of the main tunnels behind Alice also has to be removed from the first tunnel, turned, and installed in the second.
机译:随着隧道和隧道的施工,Waterview Connection TBM的备用列车正在转向与刀盘和护罩连接,该刀盘和护罩已经在其第二个钻孔路径上工作。 TBM在临时龙门架的支持下开挖了第二条隧道所需的270m,施工工作于2月20日暂停。新西兰运输局公路经理布雷特·格里登说:“现在有足够的空间将所有必要的装备带入隧道,以便我们完成这项工作。”临时龙门必须拆除。剩下的两个龙门架-包含用于TBM操作的所有服务和备用设备-必须从第一条隧道中拉出,在Northern Approach Trench(NAT)内旋转180度,然后重新连接到刀头。用于在Alice后面的主要隧道地板上建造服务涵洞的铺设涵道的龙门架也必须从第一个隧道中拆除,转弯并安装在第二个隧道中。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号