首页> 外文期刊>Tunnels & tunnelling international >AMSTERDAM OVER-TUNNEL CONSTRUCTION
【24h】

AMSTERDAM OVER-TUNNEL CONSTRUCTION

机译:阿姆斯特丹隧道施工

获取原文
获取原文并翻译 | 示例
       

摘要

THE BRITISH TUNNELLING SOCIETY chair Mark Leggett welcomed a packed audience, in the Telford Theatre at the Institution of Civil Engineers, to the Evening Meeting and introduced the speaker, Robin Vervoorn. He explained that Vervoorn was Head of Underground Infrastructure and Geotechnics, at Witteveen £t Bos, based in Amsterdam, in the Netherlands. He went on to say that Vervoorn is responsible for project management, control of geotechnical risk and innovation and has 12 years international experience in the design of tunnels and other infrastructure in compact urban environments. One of these projects, the Damrak, at Amsterdam Central Station, he is going to talk about this evening.
机译:英国隧道协会主席马克·莱格特(Mark Leggett)在土木工程师学会的特尔福德剧院(Telford Theatre)迎接了晚会的听众,并介绍了演讲者罗宾·沃沃恩(Robin Vervoorn)。他解释说,Vervoorn是位于荷兰阿姆斯特丹的Witteveen£t Bos地下基础设施和岩土工程负责人。他继续说,Vervoorn负责项目管理,岩土工程风险控制和创新,在紧凑型城市环境中的隧道和其他基础设施设计方面拥有12年国际经验。其中一个项目是阿姆斯特丹中央车站的达姆拉克(Damrak),他将在今天晚上谈论这个问题。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号