【24h】

ENCOUNTERING PINGOES

机译:碰碰碰

获取原文
获取原文并翻译 | 示例
           

摘要

Lessons learned from the Lee Tunnel experience can be divided into two categories. In terms of our understanding of DFHs we have learned that their geology is far more complex than previously thought, large DFHs adversely affect the ground at greater depth than previously thought and large DFHs reaching the chalk may be in hydrological communication over considerable distances. In terms of the management of the tunnelling process through DFHs we have learned that even well-controlled encounters with a DFH at depth can lead to settlement at ground level, and good communication and planning are imperative for a satisfactory outcome. Looking to the future, the designers are satisfied that there are no long-term implications for the tunnel given the disturbed geology at depth, and thankfully the Northern Outfall Sewer is not at risk.
机译:从李隧道的经验中学到的教训可以分为两类。根据我们对DFH的理解,我们了解到它们的地质比以前认为的要复杂得多,大型DFH对地面的影响比以前认为的要深,并且到达白垩的大型DFH可能在相当长的距离内进行水文通信。在对通过DFH进行的隧道施工过程的管理方面,我们了解到,即使深入控制与DFH的深度接触,也可能导致地面沉降,而且良好的沟通和计划对于取得令人满意的结果至关重要。展望未来,考虑到深层地质问题,设计人员对隧道没有长期影响,幸运的是,北部排污管没有风险。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号