Construction of immersed tunnel in off-shore wave conditions Busan-Geoje project South Korea

机译:海上波浪条件下的沉管隧道建设韩国釜山-巨济项目

获取原文
获取原文并翻译 | 示例
           

摘要

The Busan-Geoje Fixed Link Project is a major project in South Korea. The project includes two cable-stay bridges of 1650 and 1865 m and a 3380 m long immersed tunnel with a deep point 52 m (foundation level) below mean sea level. The immersed tunnel is planned to be built in deep water and in off-shore conditions. These harsh conditions for an immersed tunnel have never been seen before. The foundation conditions for the immersed tunnel are extremely difficult with very soft marine clays whose stiffness had to be improved before direct foundation on a gravel bed could be implemented. The immersed tunnel consists of 16 ordinary tunnel elements and 2 special tunnel elements with a climbing lane, all with a length of 180 m. Each tunnel element is built up of 8 segments with a length of 22.5 m where the first and the last segments are special segments with end frames and provision for bulkheads. The typical cross-section dimensions are 26.46 m wide by 9.97 m high.
机译:釜山-吉奥固定链接项目是韩国的一个重要项目。该项目包括两座分别为1650和1865 m的斜拉桥以及一条3380 m长的沉管隧道,其深点在平均海平面以下52 m(基础水平)。该沉管隧道计划在深水和近海条件下建造。浸入式隧道的这些恶劣条件从未见过。沉浸隧道的地基条件非常困难,要使用非常柔软的海洋粘土,必须先提高刚度,然后才能在砾石层上直接基础。沉管隧道由16条普通隧道元素和2条带爬坡车道的特殊隧道元素组成,长度均为180 m。每个隧道单元由8个长度为22.5 m的分段组成,其中第一个和最后一个分段是特殊的分段,带有末端框架并设有舱壁。典型的横截面尺寸为26.46 m宽x 9.97 m高。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号