首页> 外文期刊>Tunnelling and underground space technology >Tunnel Boring Machine (TBM) selection using fuzzy multicriteria decision making methods
【24h】

Tunnel Boring Machine (TBM) selection using fuzzy multicriteria decision making methods

机译:基于模糊多准则决策方法的隧道掘进机选择

获取原文
获取原文并翻译 | 示例
           

摘要

The problem of Tunnel Boring Machine (TBM) selection has a significant impact on the speed and cost of excavating sector; so that it is a strategic issue. On the other hand, selecting the optimum TBM among a pool of alternatives is a multicriteria decision making (MCDM) problem. In this paper, an evaluation model based on the fuzzy analytic hierarchy process (AHP) and another fuzzy MCDM technique, namely fuzzy technique for order performance by similarity to ideal solution (TOPSIS) is developed to help the tunneling designers in the process of the TBM selection under fuzzy environment where the vagueness and uncertainty are taken into account with linguistic variables parameterized by triangular fuzzy numbers. The fuzzy AHP is applied to form the structure of the TBM selection problem and to determine weights of the evaluation criteria, and fuzzy TOPSIS method is utilized to acquire final ranking. A real world case study is illustrated in order to demonstrate the potential of the proposed model for the TBM selection issue. It demonstrates the effectiveness and capability of the proposed model.
机译:隧道掘进机(TBM)的选择问题对开挖速度和成本有重大影响。因此这是一个战略问题。另一方面,在备选方案中选择最佳的TBM是多准则决策(MCDM)问题。本文建立了基于模糊层次分析法(AHP)和另一种模糊MCDM技术的评估模型,即基于与理想解相似性的订单性能模糊技术(TOPSIS),以帮助隧道设计人员进行TBM过程在模糊环境下的选择,其中考虑了模糊性和不确定性,并用三角模糊数参数化了语言变量。应用模糊层次分析法形成TBM选择问题的结构,确定评价标准的权重,采用模糊TOPSIS法获得最终排名。举例说明了一个现实世界的案例研究,以证明所提出的模型对TBM选择问题的潜力。它证明了所提出模型的有效性和能力。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号