首页> 外文期刊>Tunnelling and underground space technology >Model test of immersed tube tunnel foundation treated by sand-flow method
【24h】

Model test of immersed tube tunnel foundation treated by sand-flow method

机译:砂流法处理沉管隧道地基模型试验

获取原文
获取原文并翻译 | 示例
       

摘要

In order to explore the immersed tunnel foundation treated by sand-flow method, modeling principles for the full-scale model test of sand flow were put forward. In addition, a sand-flow test model was built, which consisted of model system, equipment system and measurement system. The situation of sand-deposit expanding and the water pressure in the foundation trench were evaluated through the model test. The results show that a semi-closed space was formed between the model board and the expanding sand deposit, which made the water pressure in it rising with little range of volatility. The sand deposit gradually became non-circular truncated cone which shaped with its expanding radius, and the difference of the water pressure increased at each direction. The water pressure in crater had a linear increase with the sand-deposit radius, with a maximal value of 0.015 2 MPa. The volatility of the water pressure under the tunnel board and the water pressure value in the crater could be used as bases of construction control.
机译:为了探索砂流法处理的沉管隧道地基,提出了砂流全尺寸模型试验的建模原理。建立了流沙试验模型,该模型由模型系统,设备系统和测量系统组成。通过模型试验评估了沙积膨胀的情况和基坑中的水压。结果表明,样板与膨胀砂沉积物之间形成了一个半封闭的空间,使得其中的水压上升幅度很小。沉积物逐渐变成非圆形的截锥形,其形状随着其半径的增大而增大,并且水压差在各个方向上都增大。火山口的水压随沉积砂半径的增加而线性增加,最大值为0.015 2 MPa。隧道板下水压的波动性和火山口中水压值可作为施工控制的依据。

著录项

  • 来源
    《Tunnelling and underground space technology》 |2014年第2期|102-108|共7页
  • 作者单位

    School of Civil Engineering & Transportation, South China University of Technology, Guangzhou 510640, Guangdong, PR China,Guangzhou Electric Power Design Institute, Guangzhou 510075, Guangdong, PR China;

    School of Civil Engineering & Transportation, South China University of Technology, Guangzhou 510640, Guangdong, PR China;

    School of Civil Engineering & Transportation, South China University of Technology, Guangzhou 510640, Guangdong, PR China;

    School of Civil Engineering & Transportation, South China University of Technology, Guangzhou 510640, Guangdong, PR China;

    School of Civil Engineering & Transportation, South China University of Technology, Guangzhou 510640, Guangdong, PR China,State Key Laboratory of Subtropical Building Science, Guangzhou 510641, Guangdong, PR China;

    School of Civil Engineering & Transportation, South China University of Technology, Guangzhou 510640, Guangdong, PR China;

    School of Civil Engineering & Transportation, South China University of Technology, Guangzhou 510640, Guangdong, PR China;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

    Immersed tube tunnel; Foundation treatment; Sand-flow method; Model test; Sand deposit; Water pressure;

    机译:沉管隧道;基础治疗;砂流法;模型测试;沙粒沉积;水压力;

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号