Differences in aerodynamic effects when trains with different marshalling forms and lengths enter a tunnel

机译:具有不同编组形式和长度的列车进入隧道时空气动力学效果的差异

获取原文
获取原文并翻译 | 示例

摘要

Unsteady Reynolds-averaged Navier-Stokes (URANS) simulations were performed to simulate trains with different marshalling forms and lengths entering a tunnel. Three models, including a short train, a double train and a long train, were used to analyse the influence of the train configuration on the pressure variations during a train's passage. The results of the numerical predictions were validated against existing experimental data, with which they showed good agreement. The differences in the maximum pressure peak distribution and the pressure fluctuations were analysed by means of Mach diagrams. The results show that the grouping length exerts a considerable influence on the amplitude of the pressure on the train body and that the influence of the grouping length on the pressure variation on the tunnel wall varies with the location in the tunnel. The tunnel space can be divided into three and four zones with regard to the influences on the maximum positive and negative pressure values, respectively. The different marshalling forms also influence the maximum peak values and local profiles of the pressure history curves, although this influence is much slighter than that of the train's grouping length.
机译:进行了非稳态雷诺平均Navier-Stokes(URANS)模拟,以模拟进入隧道的具有不同编组形式和长度的列车。使用三种模型,包括短列车,双列车和长列车,来分析列车配置对列车通过过程中压力变化的影响。数值预测的结果已针对现有的实验数据进行了验证,与它们的一致性很好。通过马赫图分析最大压力峰值分布和压力波动之间的差异。结果表明,分组长度对列车车体压力幅值有很大影响,分组长度对隧道壁压力变化的影响随隧道位置的变化而变化。就最大正压力值和负压力值的影响而言,隧道空间可分为三个区域和四个区域。不同的编组形式也会影响压力历史曲线的最大峰值和局部曲线,尽管这种影响比火车的分组长度要小得多。

著录项

  • 来源
    《Tunnelling and underground space technology 》 |2019年第2期| 70-81| 共12页
  • 作者单位

    Cent S Univ, Sch Traff & Transportat Engn, Minist Educ, Key Lab Traff Safety Track, Changsha 410075, Hunan, Peoples R China;

    Cent S Univ, Sch Traff & Transportat Engn, Minist Educ, Key Lab Traff Safety Track, Changsha 410075, Hunan, Peoples R China;

    Cent S Univ, Sch Traff & Transportat Engn, Minist Educ, Key Lab Traff Safety Track, Changsha 410075, Hunan, Peoples R China;

    Cent S Univ, Sch Traff & Transportat Engn, Minist Educ, Key Lab Traff Safety Track, Changsha 410075, Hunan, Peoples R China;

    Cent S Univ, Sch Traff & Transportat Engn, Minist Educ, Key Lab Traff Safety Track, Changsha 410075, Hunan, Peoples R China;

    Cent S Univ, Sch Traff & Transportat Engn, Minist Educ, Key Lab Traff Safety Track, Changsha 410075, Hunan, Peoples R China;

    Chalmers Univ Technol, Dept Mech & Maritime Sci, S-41296 Gothenburg, Sweden;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

    High-speed train; Railway tunnel; Marshalling form; Marshalling length; Pressure wave; Wave superposition;

    机译:高速列车;铁路隧道;编组形式;编组长度;压力波;波叠加;