首页> 外文期刊>Tunnel >Third Tunnelling Colloquium in Muenster
【24h】

Third Tunnelling Colloquium in Muenster

机译:明斯特第三届隧道学术研讨会

获取原文
获取原文并翻译 | 示例
       

摘要

On May 7, the Muenster Tunnelling Colloquium took place at the Muenster University of Applied Sciences, chaired by Prof. Dietmar Maehner from the Institute for Underground Construction (IuB). Around 200 engineers, contractors, consultants, manufacturers and students attended the event. "The demand was great", organizer Prof. Maehner was pleased to say. The Colloquium dealt with topics like designing tunnel inner shells and lining with regard to planning, construction material technology and practical application. Quality assurance was a further significant parameter as e.g. in conjunction with non-destructive testing (RI-ZFP-TU), as well as a report on initial findings with the recipe and application of polypropylene (PP) fibres used for fire protection for the inner shell of the Buehl Tunnel at Siegen. Other papers dealt with applying engineering technology as for instance, driving technology in the Bossler Tunnel (7000/8450 m ofTBM excavation) on the new rail route from Stuttgart to Ulm, planning and executing drill+blast operations to drive tunnels (low-vibration and precise blasting, measurements inside and outside the tunnel) and the shield drive for the 4.27 km long Rastatt rail tunnel in conjunction with freezing zones given shallow overburden. Responses were also provided to questions relating to how to deal with face stability problems following cave-ins or blow-outs (for example the addition of fillers to the bentonite suspension, injecting self-setting artificial soils, sprayable membranes).
机译:5月7日,明斯特隧道技术研讨会在明斯特应用科技大学举行,由地下建筑研究所(IuB)的Dietmar Maehner教授主持。大约200名工程师,承包商,顾问,制造商和学生参加了此次活动。组织者Maehner教授高兴地说:“需求很大。”座谈会就规划,建筑材料技术和实际应用等主题进行了设计,如设计隧道内壳和衬砌。质量保证是另一个重要参数,例如与无损检测(RI-ZFP-TU)结合使用,以及一份有关配方的初步发现的报告,以及在Siegen的Buehl隧道内壳用于防火的聚丙烯(PP)纤维的应用。其他论文涉及应用工程技术,例如,在从斯图加特到乌尔姆的新铁路线上的Bossler隧道(TBM开挖7000/8450 m)中的驱动技术,规划和执行钻探+爆破操作以驱动隧道(低振动和低速)。精确的爆破,隧道内部和外部的测量)以及4.27公里长的拉施塔特铁路隧道的盾构驱动以及覆盖浅层的冻结带。还回答了有关如何解决塌方或爆​​裂后面部稳定性问题的问题(例如,向膨润土悬浮液中添加填料,注入自凝性人造土壤,可喷涂膜)。

著录项

  • 来源
    《Tunnel》 |2015年第4期|61-61|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号