East Conde Street is the only industrial park access to two businesses in Janesville, Wis., where they experience steady schedules of truck traffic throughout the day. Shutting down East Conde Street to replace a 660-ft section of 12-in. sewer lying 19 ft beneath it would be a tremendous financial burden on these companies. A camera report showed that nearly a quarter of the sewer pipe's bottom portion had disintegrated. Replacement to prevent any more collapses became an urgent priority, and pipe bursting was the recommended replacement technique. The job was awarded to Speedway Sand & Gravel of Middleton,Wis., which would perform a 12on-12-in. pull of fused HDPE pipe in a single pipe bursting run. Speedway selected a 15.75-in. concrete expander to run behind a pilot pulled by a 125-ton static bursting machine for this job.
机译:East Conde街是威斯康星州简斯维尔的两家企业唯一的工业园区入口,在那里他们全天都有稳定的卡车运输时间表。关闭东部孔德街以替换660英尺长的12英寸部分。下层19英尺以下的下水道将给这些公司带来巨大的财务负担。摄像机报告显示,下水道底部的近四分之一已经分解。为了防止更多的倒塌,更换是当务之急,推荐使用爆管技术。该工作被授予威斯康星州Middleton的Speedway Sand&Gravel,该公司将进行12英寸12英寸钻进。在一次管道破裂操作中将熔融的HDPE管道拉出。赛道选择了15.75英寸。混凝土膨胀机在由125吨静态爆破机拉动的飞行员后面运行,以完成此项工作。

著录项

  • 来源
    《Trenchless Technology》 |2013年第10期|58-58|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号