...
首页> 外文期刊>Transportation Research Record >Field Evaluation of Late Merge Traffic Control in Work Zones
【24h】

Field Evaluation of Late Merge Traffic Control in Work Zones

机译:工作区中后期交通管制的现场评估

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

The traffic control strategy of the late merge in work zones was devised to improve flow and safety at work zone lane closures. Although some states have put the strategy into practice, only a handful of short-term field studies have formally evaluated its effectiveness. Additional field studies were necessary to assess the efficacy of the strategy and its proper deployment. This paper documents the results of a field test of the late merge traffic control conducted over several months. The late merge strategy was evaluated by comparing its effectiveness with that of traditional plans for work zone lane closures. The field test was conducted on a primary route in Tappahannock, Virginia, at a two-to-one lane closure. Results showed that throughput increased, but the increase was not statistically significant. Likewise, time in queue decreased, but the decrease was not statistically significant. These results were much less dramatic than those of other studies. Possible reasons for this disparity include different driver populations, road types, vehicle mixes, and site-specific characteristics. Despite limited improvements in throughput and time in queue, more drivers were in the closed lane, a positive response to the late merge signs.
机译:设计了工作区后期合并的交通控制策略,以改善工作区车道封闭处的流量和安全性。尽管一些州已将该策略付诸实践,但只有少数短期实地研究正式评估了该策略的有效性。为了评估该策略的有效性及其正确部署,还需要进行其他现场研究。本文记录了几个月来进行的后期合并流量控制的现场测试结果。通过将后期合并策略与传统的关闭工作区通道计划的有效性进行比较,评估了后期合并策略。现场测试是在弗吉尼亚州塔帕汉诺克的一条主要路线上进行的,车道封闭为二比一。结果显示吞吐量增加了,但是增加没有统计学意义。同样,排队时间减少了,但减少幅度在统计上并不显着。这些结果远没有其他研究那么引人注目。这种差异的可能原因包括不同的驾驶员数量,道路类型,车辆组合以及特定地点的特征。尽管吞吐量和排队时间的改进有限,但更多的驱动程序处于封闭通道,这对后期合并标志产生了积极的响应。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号