...
首页> 外文期刊>Transit Australia >WESTERN AUSTRALIA
【24h】

WESTERN AUSTRALIA

机译:澳大利亚西部

获取原文
获取原文并翻译 | 示例

摘要

From 1800 on 7 October the major shut down to allow connection of the Southern Suburbs Railway to the rest of the system began. Transperth buses ran between Glendalough and Perth and trains between Clarkson and Leederville. Glendalough was the bus interchange because it has a bus station and at Leederville there is no room to queue buses. Additional tag-off facilities have been installed at Glendalough for passengers changing vehicles. No fares were to betaken on the buses. From 13 October Transperth buses worked between Stirling and Perth and normal fares applied.
机译:从1800年10月7日起,主要停工,以允许将南郊铁路连接到系统的其余部分。 Transperth巴士在Glendalough和Perth之间行驶,而火车在Clarkson和Leederville之间行驶。格兰达洛(Glendalough)是公交枢纽,因为它有一个公交车站,而在利德维尔(Leederville)没有排长队的空间。格兰达洛(Glendalough)已安装了额外的标记设施,用于乘客更换车辆。公交车上没有票价。从10月13日起,斯特珀斯和珀斯之间的Transperth巴士开始运营,并采用普通票价。

著录项

  • 来源
    《Transit Australia 》 |2007年第12期| p.378-379| 共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 交通运输 ;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号