...
首页> 外文期刊>Transit Australia >Malaysian Budget 2008-2009
【24h】

Malaysian Budget 2008-2009

机译:马来西亚2008-2009年预算

获取原文
获取原文并翻译 | 示例

摘要

The Malaysian Budget announced in August included many transport measures were included. A summary of these is listed below. RapidKL and RapidPenang are to improve public transport in the Klang Valley (Kuala Lumpur area) and Pulau Pinang (Penang). Currently, RapidKL provides bus services along 166 routes, covering more than 980 housing areas. Of these, 14% are unprofitable social routes not plied by other public transport companies. On average, 400,000 passengers use bus services daily, while 350,000 use RapidKL rail services. Overall, RapidKL provides 44% of total public transport services in the Klang Valley. RapidPenang provides bus services on 33 routes in 106 housing areas with ridership of 46,000 passengers daily, constituting 60% of total bus services in Pulau Pinang. To widen the service network, 200 additional buses will be provided, bringing the total to 350. With this, RapidPenang services will be extended to cover 14 new routes and ridership is estimated to increase to 120,000 passengers daily by the end of 2009.
机译:8月份宣布的马来西亚预算包括许多运输措施。这些的摘要在下面列出。 RapidKL和RapidPenang将改善巴生谷(吉隆坡地区)和槟榔屿(槟城)的公共交通。目前,RapidKL提供166条路线的巴士服务,覆盖980多个住房区域。其中,有14%是其他公交公司无法提供的无利可图的社会路线。平均每天有40万乘客使用公共汽车服务,而35万则使用RapidKL铁路服务。总体而言,RapidKL在巴生谷提供总公共交通服务的44%。 RapidPenang在106个房屋区域的33条路线上提供巴士服务,每天载客量为46,000名乘客,占槟城岛全部巴士服务的60%。为了扩大服务网络,将增加200辆公共汽车,使总数达到350辆。RapidPenang的服务将扩展到14条新路线,到2009年底,每天的载客量估计将增加到12万人次。

著录项

  • 来源
    《Transit Australia 》 |2008年第11期| p.343| 共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 交通运输 ;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号