...
首页> 外文期刊>Transit Australia >WESTERN AUSTRALIA
【24h】

WESTERN AUSTRALIA

机译:澳大利亚西部

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Further bus service changes were introduced from 9 May including a new service connecting Armadale and Mandurah railway stations, replacing Route 529 between Armadale and Cockburn Central Stations, which was given a six months trial. The new service was introduced in response to community and passenger requests, and reflects the growing range of destinations developing around Murdoch University as well as the benefits of connecting the two railway lines. The Route 529 trial required patronage figures of 31 in the morning peak, 23 in the evening peak and 21 off-peak to warrant permanent operation. Throughout the busiest month of March, it averaged only seven, six and four respectively.
机译:从5月9日开始,对巴士服务进行了进一步的更改,包括连接Armadale和Mandurah火车站的新服务,以替代Armadale和Cockburn中央火车站之间的529号公路,并进行了为期六个月的试用。引入这项新服务是为了响应社区和乘客的要求,反映了默多克大学周围不断发展的目的地范围以及连接两条铁路线的好处。 529号公路的审判要求在早上高峰期的乘客量为31,在晚上高峰期的乘客量为23,在非高峰期的乘客量为2,才能保证长期运行。在整个三月最忙的月份中,平均分别只有七个,六个和四个。

著录项

  • 来源
    《Transit Australia》 |2011年第6期|p.184|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号