...
首页> 外文期刊>Transactions of the American nuclear society >Error Sources Considered in the 'UMAE Driven' CIAU Methodology
【24h】

Error Sources Considered in the 'UMAE Driven' CIAU Methodology

机译:“ UMAE驱动” CIAU方法中考虑的错误源

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Key issues for the application of uncertainty methods within the licensing processes of Nuclear Power Plants, i.e. 'pursuing the BEPU (Best Estimate Plus Uncertainty) approach', are constituted by the qualification and the demonstration of qualification of those methods. Bases for the qualification are the availability of experimental data and robust/reproducible procedures for the application of the uncertainty methods.
机译:在核电厂的许可过程中应用不确定性方法的关键问题,即“追求BEPU(最佳估计加上不确定性)方法”,是由这些方法的资格认定和证明构成的。资格的基础是实验数据的可用性以及不确定性方法应用的可靠/可重现的程序。

著录项

  • 来源
    《Transactions of the American nuclear society》 |2010年第03期|p.974-976|共3页
  • 作者

    F. DAuria; A. Petruzzi;

  • 作者单位

    Nuclear Research Group of San Piero a Grado (GRNSPG) - University of Pisa Via Livornese 1291, 56100 Pisa-Italy;

    rnNuclear Research Group of San Piero a Grado (GRNSPG) - University of Pisa Via Livornese 1291, 56100 Pisa-Italy;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号