...
首页> 外文期刊>Today''s Railways: Europe >Brescia-Verona-Padova HSL approved
【24h】

Brescia-Verona-Padova HSL approved

机译:布雷西亚-维罗纳-帕多瓦HSL批准

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

In December 2017 Italy's Interdepartmental Committee for Economic Planning approved the final project for the Verona-Padova section of the Milano-Venezia high speed line and allocated €2.7 billion for the 44.3 km Verona-Bivio Vicenza section. Currently expected costs are €805 million for the Vicenza node (6.5 km) and €1.3 billion for the 27.5 km Vicenza-Padova section. The line, part of the TEN-T "Mediterranean" corridor (Spain-Ukraine), will be 78.8 km long of which 35 km alongside the historic line, 36 km on embankments, 5.5 km on viaducts and 2.3 km in tunnels. Completion is currently forecast for 2025.
机译:2017年12月,意大利经济计划部际委员会批准了米兰-威尼斯高速线维罗纳-帕多瓦段的最终项目,并为44.3公里的维罗纳-比维奥维琴察段拨款27亿欧元。目前预计维琴察节点(6.5公里)的成本为8.05亿欧元,维琴察-帕多瓦27.5公里段的成本为13亿欧元。这条线是TEN-T“地中海”走廊(西班牙-乌克兰)的一部分,全长78.8公里,其中沿历史路线长35公里,在堤岸上长36公里,在高架桥上长5.5公里,在隧道中长2.3公里。目前预计将于2025年完成。

著录项

  • 来源
    《Today''s Railways: Europe》 |2018年第270期|7-7|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号