...
首页> 外文期刊>Today''s Railways: Europe >ALPINE CROSSINGS: THE BRENNER BASE TUNNEL PROJECT
【24h】

ALPINE CROSSINGS: THE BRENNER BASE TUNNEL PROJECT

机译:阿尔卑斯山穿越:布伦纳基地隧道项目

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

The old Brenner line The railway line over the Brenner Pass is one of the most important Alpine railway crossings, which links Germany and Austria with Italy. It was built in stages during the 19th century. Verona-Trento was completed on 19 September 1858, Kufstein-Innsbruck opened on 24 November 1858 and Trento-Bolzano followed on 17 May 1859. It took eight more years to complete the mountain section between Innsbruck and Bolzano. That was opened on 17 August 1867 as a single line although space for a second track had already been reserved. It was only in 1908 that doubling Innsbruck-Bolzano was completed.
机译:旧的布伦纳线布伦纳山口上方的铁路线是最重要的阿尔卑斯铁路道口之一,连接德国,奥地利和意大利。它建于19世纪。维罗纳-特伦托(Verona-Trento)于1858年9月19日完工,库夫斯坦-因斯布鲁克(Kufstein-Innsbruck)于1858年11月24日开业,特伦托-博尔扎诺(Trento-Bolzano)随后于1859年5月17日竣工。花了八年多的时间才完成因斯布鲁克和博尔扎诺之间的山脉。 1867年8月17日作为一条线路开放,尽管已经预留了第二条轨道的空间。直到1908年,因斯布鲁克-博尔扎诺才完成了翻番。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号