首页> 外文期刊>Thermal science >CAMPUS AND COMMUNITY MICRO GRIDS INTEGRATION OF BUILDING INTEGRATED PHOTOVOLTAIC RENEWABLE ENERGY SOURCES: CASE STUDY OF SPLIT 3 AREA, CROATIA - PART A
【24h】

CAMPUS AND COMMUNITY MICRO GRIDS INTEGRATION OF BUILDING INTEGRATED PHOTOVOLTAIC RENEWABLE ENERGY SOURCES: CASE STUDY OF SPLIT 3 AREA, CROATIA - PART A

机译:建筑光伏综合可再生能源的校园和社区微网格整合:克罗地亚斯普利特3区的案例研究-A部分

获取原文
获取原文并翻译 | 示例
           

摘要

Micro grids interconnect loads and distributed energy resources as a single controllable entity. New installations of renewable energy sources (RES) in urban areas, such as Building Integrated Photovoltaic (BIPV), provide opportunities to increase energy independence and diversify energy sources in the energy system. This paper explores the integration of RES into two case study communities in an urban agglomeration to provide optimal conditions to meet a share of the electrical loads. Energy planning case studies for decentralized generation of renewable energy are conducted in H2RES energy planning software for hourly energy balances. The results indicate that BIPV and PV in the case study communities can cover about 17% of the recorded electrical demand of both areas. On a yearly basis, there will be a 0.025 GWh surplus of PV production with a maximum value of 1.25 MWh in one hour of operation unless grid storage is used. This amounts to a total investment cost of 13.36 million EUR. The results are useful for proposing future directions for the various case study communities targeting sustainable development.
机译:微电网将负载和分布式能源互连为单个可控实体。在城市地区新安装的可再生能源(RES),例如建筑光伏(BIPV),为提高能源独立性和使能源系统中的能源多样化提供了机会。本文探讨了将RES整合到城市群中的两个案例研究社区中,以提供最佳条件来满足部分电力负荷的情况。在H2RES能源规划软件中进行了可再生能源分散发电的能源规划案例研究,以实现小时能源平衡。结果表明,案例研究社区中的BIPV和PV可以满足两个地区记录的电力需求的大约17%。每年,除非使用电网存储,否则一小时的运行将有0.025 GWh的盈余光伏发电,最大值为1.25 MWh。总投资成本为1,336万欧元。这些结果对于为各种针对可持续发展的案例研究社区提出未来的方向很有用。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号