首页> 外文期刊>Thermal engineering >Development of a Procedure for Starting Up a 300-MW Power-Generating Unit with a TGMP-114 Boier under a Siding Pressure at the Kostroma District Power Station
【24h】

Development of a Procedure for Starting Up a 300-MW Power-Generating Unit with a TGMP-114 Boier under a Siding Pressure at the Kostroma District Power Station

机译:在科斯特罗马地区电站的侧压力下,开发一种用于启动带有TGMP-114 Boier的300 MW发电机组的程序

获取原文
获取原文并翻译 | 示例
           

摘要

The results of experimental start-ups of a 300-MW supercritical-pressure power-generating unit with a TGMP-114 boiler under a sliding pressure throughout the steam-water circuit without using outside steam are discussed. The reliability of the retrofitted starting scheme of the power-generating unit was estimated. The algorithm for its start-up was developed. The reliability of the heating surfaces of the given boiler under the conditions studied was demonstrated.
机译:讨论了带有TGMP-114锅炉的300兆瓦超临界发电装置在整个蒸汽-水回路中滑动压力且不使用外部蒸汽的情况下的实验启动结果。估算了发电机组改造启动方案的可靠性。开发了用于启动的算法。证明了在研究条件下给定锅炉受热面的可靠性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号