...
首页> 外文期刊>Thermal engineering >Technology Used to Operate the 300-MW Power Unit Topped with a GTE-110 Gas Turbine
【24h】

Technology Used to Operate the 300-MW Power Unit Topped with a GTE-110 Gas Turbine

机译:用于运行装有GTE-110燃气轮机的300 MW发电机组的技术

获取原文
获取原文并翻译 | 示例

摘要

Results obtained from mathematical simulation of operations for starting the 300-MW power unit topped with a GTE-110 gas turbine installed at the GRES-24 district power station of OAO OGK-6 wholesale power-generating company are described. It is shown that operations on speeding up the steam turbine from a cold state to its idle running mode can be carried out solely by using the heat of exhaust gases from the gas turbine unit without supplying fuel to the boiler.
机译:描述了从数学运算中获得的结果,该数学运算用于启动装在OAO OGK-6批发电力公司的GRES-24区域电站中的装有GTE-110燃气轮机的300 MW机组的运行。示出了仅通过利用来自燃气轮机单元的废气的热量就可以进行将蒸汽轮机从冷状态加速到其空转运行模式的操作,而无需向锅炉供应燃料。

著录项

  • 来源
    《Thermal engineering》 |2010年第9期|p.729-734|共6页
  • 作者单位

    All-Russia Thermal Engineering Institute, ul. Avtozavodskaya 14/23, Moscow, 115280 Russia;

    OOO Optsim-K, ul. Yangelya 8-72, Moscow, 117534 Russia;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号