首页> 外文期刊>The Railway Magazine >Why not electrify the Peak line?
【24h】

Why not electrify the Peak line?

机译:为什么不给Peak Line通电?

获取原文
获取原文并翻译 | 示例
       

摘要

With Railtrack indicating its intention to re-open the Peak Line, a once-only golden opportunity to electrify the route is presented. As the line threads the Peak National Park, why allow this beautiful area to suffer more pollution? New stock will doubtless be required and tilting trains need to be purchased if a viable alternative service to and from Manchester is to be offered in competition with Virgin's overpriced WCML route. As the current Midland Main Line HSTs will be close to life-expiry when the line opens, the timing for replacement stock couldn't be better. The MML is already electrified as far as Bedford, so this is a chance to give the UK a third north-south electric railway.
机译:Railtrack表示有意重新开放山顶线,这为该路线通电提供了一次绝妙的机会。当这条线路穿过山顶国家公园时,为什么还要让这个美丽的地区遭受更多的污染?如果要与维珍航空定价过高的WCML路线竞争,提供往返曼彻斯特的可行替代服务,无疑将需要新的库存,并且需要购买倾斜的火车。由于当前的Midland Main Line HST开通后将接近使用寿命,因此更换库存的时机再好不过了。 MML直到贝德福德已经电气化,因此这是向英国提供第三条南北电力铁路的机会。

著录项

  • 来源
    《The Railway Magazine》 |2000年第1191期|p.44|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 铁路运输;
  • 关键词

  • 入库时间 2022-08-18 01:42:11

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号