首页> 外文期刊>Railway magazine >Railtours Track Record
【24h】

Railtours Track Record

机译:铁路旅行记录

获取原文
获取原文并翻译 | 示例
       

摘要

GWR flagship engine, 'King' Class No. 6024 King Edward I, has returned to the main line, having been out of action since last year while repairs were carried out at the West Somerset Railway.rnThe 'King' began running-in trials on the WSR in mid-July and clocked up more than 500 miles of both light engine andrnloaded trials by the start of August.rnAugust 10 marked its return to the main line, making a loaded test run with five carriages between Bristol and Shrewsbury for main line proving of the work carried out at Williton over the last eight months.
机译:GWR旗舰发动机,国王级6024爱德华一世国王号,已从去年开始停运,当时在西萨默塞特铁路进行了维修,现已重返主线.rn``国王''开始进行磨合试验7月中旬在WSR进行了试飞,并在8月初完成了500英里的轻型发动机和空载试验。rn 8月10日标志着它回到了主线,在布里斯托尔和什鲁斯伯里之间进行了载有五个车厢的载重试车在过去八个月中在Williton进行的工作的在线验证。

著录项

  • 来源
    《Railway magazine》 |2009年第1302期|64-66|共3页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 01:33:40

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号