首页> 外文期刊>The Railway Magazine >B12 winter tests on East Lanes before return to North Norfolk
【24h】

B12 winter tests on East Lanes before return to North Norfolk

机译:在返回北诺福克之前,在East Lanes进行B12冬季测试

获取原文
获取原文并翻译 | 示例
       

摘要

The Midland & Great Northern Joint Railway Society's B12 No. 8572 will be tested on the East Lancashire Railway (in undercoat) prior to dispatch back to its North Norfolk Railway home. The boiler, overhauled by Chatham Steam, will be mounted in the frames at Ian Riley's works (where the chassis has been refurbished) while the tender (overhauled at Weybourne) is being sent to the East Lancashire Railway to join the loco. Locomotive and tender are expected back at the North Norfolk Railway during February where they will be painted.
机译:米德兰与大北方联合铁路协会的B12号8572将在东兰开夏郡铁路(内涂层)上进行测试,然后再派回北诺福克铁路房屋。由查塔姆·斯帕(Chatham Steam)检修过的锅炉将安装在伊恩·赖利(Ian Riley)的工厂的机架中(对底盘进行了翻新),而招标书(在韦本(Weybourne)进行了检修)则被送往东兰开夏郡铁路公司以加入机车。机车和车厢预计将在二月份的北诺福克铁路重新上漆。

著录项

  • 来源
    《The Railway Magazine》 |2011年第1318期|p.58|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 01:31:03

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号