首页> 外文期刊>The Railway Magazine >Bodmin counts cost of flood repairs
【24h】

Bodmin counts cost of flood repairs

机译:博德明计算洪水修复成本

获取原文
获取原文并翻译 | 示例
       

摘要

The Bodmin & Wenford Railwy has produced a detailed specification for repairs to its Bodmin Parkway branch, damaged by flood waters in the early hours of November 17(RM Jan). Around 50mm of rainfall was recorded at Cardinham (near Bodmin) during the night of November 16/17 and water flooded onto the railway from the A38 trunk road beside a bridge that carries the main road over the B&WR. This caused significant damage to the track and lineside along a half-mile stretch between Colesloggett Halt and Bodmin Parkway. An insurance loss adjuster has visited and the report will encompass the corrective work required and likely costs. Repairs might start before Christmas, but certainly early in the New Year.
机译:Bodmin&Wenford Railwy已为其Bodmin Parkway分支机构制定了详细的维修规范,该分支机构在11月17日凌晨(1月RM)被洪水损坏。 11月16日至17日晚上,卡迪纳姆(博德明附近)记录了大约50毫米的降雨量,水从A38主干道旁边的水淹没在铁路上,该桥旁边是承载B&WR的主要道路。这对Colesloggett Halt和Bodmin Parkway之间的半英里长的线路造成了严重的损坏。一位保险损失理算人员已经访问过,该报告将包含所需的纠正工作和可能的成本。维修工作可能会在圣诞节前开始,但一定要在新年初期进行。

著录项

  • 来源
    《The Railway Magazine》 |2011年第1318期|p.57|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 01:31:03

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号