首页> 外文期刊>The Railway Magazine >Railmotor revival - boiler installed
【24h】

Railmotor revival - boiler installed

机译:铁路电机复兴-已安装锅炉

获取原文
获取原文并翻译 | 示例
           

摘要

Following successful operational trials of the power bogie and boiler assembly for the Great Western Society's Railmotor No. 93 on November 17 (RM Jan), the bogie was partially dismantled to enable installation in the coach body. This work required removal of the temporary platforms to accommodate crew, coal, water tank and hand brake. The boiler was lifted off the bogie on November 23 at Llangollen's Pentrefelin carriage works yard and with the coach body raised on power jacks, the bogie was pushed into place and the coach body lowered back down.
机译:在11月17日(1月RM)为Great Western Society的93号轨道电机成功进行了动力转向架和锅炉组件的运行试验之后,对转向架进行了部分拆除,以使其能够安装在教练车厢中。这项工作需要拆除临时平台以容纳船员,煤,水箱和手闸。锅炉于11月23日在Llangollen的Pentrefelin马车修理厂从转向架上提起,并在动力千斤顶上抬起了大车厢,将转向架推入到位,然后将大车厢降下。

著录项

  • 来源
    《The Railway Magazine》 |2011年第1318期|p.59|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号