首页> 外文期刊>The Railway Magazine >STEAMING TO THE LIMIT
【24h】

STEAMING TO THE LIMIT

机译:蒸到极限

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

One of the most important duties of a locomotive works was the testing of new or overhauled engines before they were allowed into traffic. In this special episode of 'P&P', we examine some remarkable examples of locomotive performance. Picture Little Somerford, a Wiltshire wayside station on the South Wales main line, on a summer's day in 1953. The atmosphere is bucolic but the signalman, who has already accepted 'Train on Line', is at his window, looking westward. A drawn-out, strident whistle sounds and a 'King' class 4-6-0 appears, thundering downhill from Badminton with more than a quarter of a mile of train.
机译:机车工作中最重要的职责之一是在允许新发动机或大修的发动机上路之前对其进行测试。在“ P&P”的这一特别节目中,我们研究了机车性能的一些杰出实例。在1953年的一个夏日里,拍摄一下南威尔士干线上威尔特郡路边小车站Little Somerford。气氛虽然充满田园风,但是已经接受了“火车上线”的信号员正向窗外望西。发出刺耳的啸叫声,出现“国王” 4-6-0级,从羽毛球上下坡,经过四分之一英里的火车轰鸣。

著录项

  • 来源
    《The Railway Magazine》 |2012年第1339期|p.67-71|共5页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号