首页> 外文期刊>The Railway Magazine >Swindon & Cricklade takes delivery of partially restored Owsden Hall
【24h】

Swindon & Cricklade takes delivery of partially restored Owsden Hall

机译:Swindon&Cricklade交付部分修复的Owsden Hall

获取原文
获取原文并翻译 | 示例
       

摘要

The rolling chassis and tender of partially overhauled No. 6984 Owsden Hall arrived at the Swindon & Cricklade Railway's Blunsdon HQ on May31.The boiler was to follow shortly after. Owsden Hall, owned by Trevor Westbury, has been under restoration at the Gloucestershire Warwickshire Railway's Toddington HQ for many years, being rated a 'rolling chassis'for more than a decade. The G-WR, frustrated by the slow progress, offered various ways forward, but agreement could not be reached.
机译:5月31日,滚动的底盘和经过部分检修的Owsden Hall的标书到达了史云顿与克里克拉德铁路公司的Blunsdon总部,当时不久,该锅炉也将紧随其后。特雷弗·韦斯特伯里(Trevor Westbury)拥有的奥斯登·霍尔(Owsden Hall)在格洛斯特郡沃里克郡铁路公司的托丁顿总部已经修复了很多年,被誉为“滚动底盘”已有十多年了。对进展缓慢感到沮丧的G-WR提供了多种前进方式,但未能达成共识。

著录项

  • 来源
    《The Railway Magazine》 |2013年第1348期|71-71|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 01:29:07

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号