首页> 外文期刊>The Railway Magazine >'Hulk'leaves scrapyard and heads for West Somerset
【24h】

'Hulk'leaves scrapyard and heads for West Somerset

机译:“绿巨人”离开废品场前往西萨默塞特郡

获取原文
获取原文并翻译 | 示例
       

摘要

Minehead's fleet of in-house locomotives has been boosted with the purchase of Large Prairie tank No. 4110. The West Somerset Railway (plc) acquisition is part of a strategy to become less reliant on short-term, hired-in locomotives. The Barry hulk has been in the ownership of Southall Railway Centre since 1979, but has not undergone any notable restoration in that time. Latterly, it has been stowed on one of the turntable roads at Tyseley, but changed hands after months of negotiations for an undisclosed sum. The money will be used by the West London society to complete the prolonged overhaul of its pannier tank No. 9682.
机译:通过购买4110号大型草原坦克,Minehead的内部机车队得到了加强。对西萨默塞特铁路(plc)的收购是减少对短期租用机车的依赖的战略的一部分。自1979年以来,巴里(Barry)绿巨人就一直归索撒尔铁路中心(Southall Railway Center)所有,但是那段时间没有得到任何明显的恢复。后来,它已被存放在Tyseley的一条转盘道路上,但经过数月的谈判(未披露金额)后易手。这笔钱将由西伦敦社会用来完成对其9682号小型坦克的长期检修。

著录项

  • 来源
    《The Railway Magazine》 |2015年第1372期|77-77|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 01:27:11

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号