首页> 外文期刊>The Railway Magazine >Diana approaches completion as VoR opens for contract work
【24h】

Diana approaches completion as VoR opens for contract work

机译:随着VoR开展合同工作,Diana即将完成

获取原文
获取原文并翻译 | 示例
       

摘要

With the magnificent new workshop facility available at Aberystwyth, the Vale of Rheidol Railway is entering the contract railway engineering business. And the first locomotive to enter the works for contracted restoration to steam is Kerr Stuart 'Sirdar'class 0-4-0T 1158/1917 Diana. The loco, which ran at the Kerry Tramway and the Oakeley and Pen-yr-Orsedd slate quarries in its working days, last steamed in 1950. It is one of only two 'Sirdar'class locos known to exist, the other being a national monument in Namibia housed in a brick-and-glass display building.
机译:随着在阿伯里斯特威斯(Aberystwyth)拥有宏伟的新车间设施,Rheidol Railway的Vale正在进入合同铁路工程业务。最早进入蒸汽压缩修复工作的机车是Kerr Stuart'Sirdar'等级0-4-0T 1158/1917 Diana。该机车在其工作日内在Kerry Tramway,Oakeley和Pen-yr-Orsedd板岩采石场运行,最后一次蒸煮是在1950年。它是已知的仅有的两种“ Sirdar”级机车之一,另一台是国家级机车。纪念碑在纳米比亚一座玻璃砖制的陈列建筑里。

著录项

  • 来源
    《The Railway Magazine》 |2015年第1366期|93-93|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 01:26:59

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号