首页> 外文期刊>The Railway Magazine >Bouncing back at Ludborough…
【24h】

Bouncing back at Ludborough…

机译:在拉德伯勒反弹……

获取原文
获取原文并翻译 | 示例
       

摘要

THE ongoing overhaul of Robert Stephenson & Hawthorns 0-6-OT Zebedee (7597/1949) has reached another key stage at the Lincolnshire Wolds Railway with the refitting of the cab to the frames. The one-time Rye House Power Station locomotive arrived at Ludborough from Peak Rail in 2014, since when the axleboxes have been repaired and the frames re-wheeled, and all of the valve gear has been overhauled and refitted. The front of the loco is now painted ready for the valves to go back into the steam chests, and the cab and bunker sprayed up to their final top-coat. It is hoped to get the valves fitted over the next few months and then the pistons and slide bars.
机译:罗伯特·斯蒂芬森和霍桑0-6-OT Zebedee(7597/1949)正在进行的大修已经达到了林肯郡沃尔德铁路的另一个关键阶段,将驾驶室重新安装到车架上。自从轴箱维修完毕并重新安装车架,并对所有气门装置进行了大修和重新安装之后,2014年的一次拉伊之家电站机车就从Peak Rail到达了拉德伯勒。现在,机车的前部已涂漆,可以将阀门放回蒸汽箱中,而驾驶室和地堡则喷涂至其最终面漆。希望在接下来的几个月中安装阀门,然后再安装活塞和滑杆。

著录项

  • 来源
    《The Railway Magazine》 |2016年第1389期|68-68|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 01:26:17

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号