首页> 外文期刊>The Railway Magazine >Corwen opening on target as Llangollen fills embankment 'Gap' to complete trackbed
【24h】

Corwen opening on target as Llangollen fills embankment 'Gap' to complete trackbed

机译:由于Llangollen填补了堤防“差距”的目标开放目标,以完成追踪

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

THE Llangollen Railway is another step closer having trains able to run into its new Corwen Central station following the filling of the 'Gap' in the embankment immediately east of the station site. After six solid days'effort by contractor and volunteers, the northern batter (boundary) of the embankment was completed on May 14. About 1,500 tonnes of material was brought in from the former Ruthin branch embankment to be layered and rolled by the volunteer team. Work on constructing the southern side of the embankment started during the week beginning May 20, as this had to remain open to the end to allow for access to deliver materials.
机译:Llangollen铁路是另一步更接近,其中列车能够在填充站点的路堤中的“差距”后填充其新的科文中央站。在承包商和志愿者六个固体时代,北方堡垒(边界)于5月14日完成。从前ruthin分支机构留下了大约1,500吨的材料,以分层并由志愿者团队卷起。在5月20日开始的一周期间,建造堤防南侧的工作,因为这必须保持开放到底,以允许进入提供材料。

著录项

  • 来源
    《The Railway Magazine》 |2019年第1419期|73-73|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号