首页> 外文期刊>The Naval Architect >Offloading meter operations
【24h】

Offloading meter operations

机译:卸载仪表操作

获取原文
获取原文并翻译 | 示例
       

摘要

Italian-based Expro has secured a contract for its PassiveSONAR clamp-on flow meters, worth US$500,000, to Teekay, working in cooperation with StatoilHydro; for shuttle tanker loading and offloading operations in the North Sea.rnExpro's PassiveSONAR meters will be used to measure the instantaneous flow rate and provide early warning of any potential loss of containment between the host facility and the shuttle tanker. The PassiveSONAR meters will be positioned immediately inboard the bow of the vessel, where data will be relayed back to the bridge to provide real time monitoring and control of the loading operations.
机译:总部位于意大利的Expro与StatoilHydro合作,与Teekay签订了一份价值500,000美元的PassiveSONAR夹钳式流量计的合同; rnExpro的PassiveSONAR仪表将用于测量瞬时流量,并对主机设施和穿梭油轮之间的任何可能的围堵损失提供预警。 PassiveSONAR仪表将直接放置在船首内侧,在那里数据将中继回桥架,以提供对装载操作的实时监控。

著录项

  • 来源
    《The Naval Architect》 |2009年第9期|16-16|共1页
  • 作者

  • 作者单位
  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号