首页> 外文期刊>The Naval Architect >No sign of slowdown in technician transfer vessel orders
【24h】

No sign of slowdown in technician transfer vessel orders

机译:技术人员转移船订单没有放缓的迹象

获取原文
获取原文并翻译 | 示例
       

摘要

Although, at present, offshore wind farm transfer vessels are certainly becoming larger than before, most architects are still playing it safe and opting for models that accommodate no more than 12 wind farm technicians, chiefly to avoid the ambiguities - and related costs - associated with upgrading to 'passenger ship' status. However, while vessels with capacity for more technicians may well become a standard future feature within this sector, orders for more compact solutions show scant sign of drying up.
机译:尽管目前海上风电场转移船肯定比以前大,但大多数建筑师仍在安全地使用它,并选择可容纳不超过12名风电场技术人员的模型,主要是为了避免与之相关的含糊不清和相关费用。升级为“客船”状态。但是,尽管有能力容纳更多技术人员的船只很可能会成为该行业未来的标准配置,但更紧凑的解决方案的订单却没有枯竭的迹象。

著录项

  • 来源
    《The Naval Architect》 |2012年第sepaappa期|p.16|共1页
  • 作者

  • 作者单位
  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号