首页> 外文期刊>The Naval Architect >Interface issues need to be tested in advance
【24h】

Interface issues need to be tested in advance

机译:接口问题需要提前测试

获取原文
获取原文并翻译 | 示例
           

摘要

In many instances the safety of individual equipment or systems can be assured relatively easily, but particular challenges arise wherever systems, equipment, and/or organisations interface.However, as Julian Woolley, leading consultant at BMT Isis - a system safety and risk management consultancy and subsidiary of BMT Group - explains, interface issues can become particularly problematic following equipment modification or replacement, during organisational change or when defining new platform, system or equipment requirements and specifications.
机译:在许多情况下,可以相对容易地确保单个设备或系统的安全,但是无论系统,设备和/或组织之间的接口如何,都会遇到特殊的挑战。但是,作为BMT Isis首席顾问Julian Woolley,这是系统安全和风险管理咨询公司BMT Group的子公司-解释说,在设备更改或更换,组织变更期间或定义新平台,系统或设备要求和规格时,接口问题会变得特别棘手。

著录项

  • 来源
    《The Naval Architect》 |2013年第maraappa期|22-23|共2页
  • 作者

  • 作者单位
  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号