首页> 外文期刊>The Naval Architect >The end of the model test era?
【24h】

The end of the model test era?

机译:模型测试时代的结束?

获取原文
获取原文并翻译 | 示例
           

摘要

Seatrade Groningen has finalised a program of 10 newbuilding vessels (completed in April 2019), delivered from different Chinese yards during the past 21/2 years. Based upon its experiences, the ship management company would like to share some of the findings which are part of a wider aspect covered by in-house analyses and related to the fleet performance monitoring program. This article is intended as a comparison between available results from the Computational Fluid Dynamics (CFD) stage, model test and sea trials for recently delivered newbuilding vessels, which are a part of four newbuilding projects.
机译:SeaTrade Groningen最终确定了10个新建筑船只(2019年4月完成的计划),在过去的21/2年中,从不同的中国院子里交付。根据其经验,船舶管理公司希望分享一些调查结果,这些发现是内部分析和与舰队绩效监测计划相关的更广泛的方面。本文旨在作为可用结果的计算流体动力学(CFD)阶段,用于最近交付的新建船只的模型试验和海上试验,这是四个新建筑项目的一部分。

著录项

  • 来源
    《The Naval Architect》 |2019年第9期|42-45|共3页
  • 作者

  • 作者单位
  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号