首页> 外文期刊>The Military Engineer >Improving Safety at Broken Bow: Technology and Teamwork Facilitate Complex Investigation
【24h】

Improving Safety at Broken Bow: Technology and Teamwork Facilitate Complex Investigation

机译:改善弓箭安全性:技术和团队协作促进复杂调查

获取原文
获取原文并翻译 | 示例
       

摘要

The Tulsa District of the U.S. Army Corps of Engineers (USACE) owns and operates 38 multi-purpose projects, among them the Broken Bow Dam, which includes a diversion tunnel and low level outlet facility (LLOF). The districts comprehensive dam safety program supports USACE's nationwide dam safety program. In response to concerns regarding Broken Bow's diversion tunnel and low level output facility, the district wanted to confirm safety and stability to ensure that facility operations could continue effectively without risk to operations staff or to downstream life and property. As an initial step in the risk assessment process, Tulsa District engaged the MH+MH Joint Venture to investigate the tunnel using only non-destructive testing methods to estimate the critical geologic parameters and tunnel performance.
机译:美国陆军工程兵团(USACE)的塔尔萨区拥有并运营38个多功能项目,其中包括断头水坝,其中包括导流隧道和低水位出口设施(LLOF)。该地区全面的大坝安全计划支持USACE的全国大坝安全计划。为了应对有关“断弓”引水隧洞和低水平输出设施的担忧,该地区希望确认安全性和稳定性,以确保设施运营可以有效地继续进行,而不会对运营人员或下游生命财产造成威胁。作为风险评估过程的第一步,塔尔萨区与MH + MH合资企业合作,仅使用非破坏性测试方法对隧道进行调查,以评估关键地质参数和隧道性能。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号